OUR PROJECTS

ANZAC MEMORIAL WALKWAY

8 steel walkway sections were fabricated on site at SGM Fabrication, delivered and installed as part of the Anzac Memorial Walkway Project at Bar Beach Newcastle

See Video Here

KURRI KURRI AMMONIUM NITRATE EMULSION PLANT

Four 304L 2B stainless steel tanks.

XSTRATA MCARTHUR RIVER MINE - NORTHERN TERRITORY

  • Correct Medium Sump
  • Dilute Medium Sump
  • Dilute Medium Sump Static Screen -
  • Dewatering Cyclones -
  • Heavy Medium Sump -
  • Heavy Medium Tank
  • Correct Medium Distribution Box.

PROJECT TRIDENT- KOORAGANG ISLAND NSW

Two effluent tanks 304L HRAP Stainless steel 9m in diameter x 6m high, the second delivery of a 5 tank contract. The tanks were taken by barge to their final destination.

See Video Here

TOP