Our Projects
Project
|
Description
|
Image
|
|
| Anzac Memorial Walkway - Newcastle 2015 |
8 steel walkway sections were fabricated on site at SGM Fabrication, delivered and installed as part of the Anzac Memorial Walkway Project at Bar Beach Newcastle. |

|
|
|
Kurri Kurri Ammonium Nitrate Emulsion Plant 2011
|
Four 304L 2B stainless steel tanks.
|

|
|
|
Xstrata McArthur River Mine - Northern Territory 2011
|
Correct Medium Sump - Dilute Medium Sump - Dilute Medium Sump Static Screen - Dewatering Cyclones - Heavy Medium Sump - Heavy Medium Tank - Correct Medium Distribution Box.
|

|
|
|
Project Trident- Kooragang Island NSW 2012-2013
|
Two effluent tanks 304L HRAP Stainless steel 9m in diameter x 6m high, the second delivery of a 5 tank contract. The tanks were taken by barge to their final destination.
|
 |
|
There are no news items available!